Some more electrical

Once I got the pulled pork in the oven to slow cook all day I decided to start by running the wire from the basement to the attic.  This was not so easy as it involved taking up some floor boards and then drilling a hole in the attic (needed Ryan’s help).  Finally we got the wire run, we still need to drill a hole to the basement but that’s the easy part!

Wire for the subpanel in the attic

They didn’t have copper wire in this gauge at home depot so we had to go with aluminum wire.  It’s a 4 wire and we should be able to run 100amps up to the subpanel.  We can’t hook this up as we don’t have the subpanel or the 100amp breakers for the basement but we just need it run so we can get insulation.

Next I started taking out the baseboards behind the radiator in the livingroom.  Once done, Ryan drilled the holes and I ran the wires for the outlet back there.

The first 2 bends
The outlet

It was no easy feat getting the wires around the corners in the cupola.  But since we plan on removing the radiators at some point I really wanted an outlet back in the center.  I screwed the wires to the outside paneling lightly so they stay in the center when we get insulation blown in this time.  This was tricky though because I had to make sure the wires weren’t too close to the outside wall because we are nailing the paneling on next summer.

3 boston butts 🙂

And now that we can put the radiator back (we should only have to move it one more time now for insulation), I decided to quit for the day and start dinner.  A quick check on the pulled pork shows them coming along nicely but not done in time to eat tonight (tomorrow for sure).  2 1/2 of these will be brought to work for pigging out on Tuesday.

After I get cleaned up maybe I’ll play a little more Diablo and relax!

Next weekend (the plan anyway)

  • fix the car?!
  • Put up a Christmas tree (got to get the house cleaned up this week then)
  • Get the lights wired in the livingroom (one switch will be on an outside wall)
  • Start wiring the front hallway!

Finally a weekend to work on the house!

And already we’ve made 2 trips to home depot 🙂  Although Friday night’s trip to home depot was to just get some weather stripping for the front door and some putty for the outside electrical entrance into the house (to make it water tight).

Today Ryan started removing the baseboards in the livingroom so we could wire, the sections that he removed and then drilled, i cleaned up and wired.  We’ve got one more section (behind the radiator) to do and the livingroom outlets will be done.  We also measured and bought the wire to run to the attic subpanel.  We decided the diningroom doesn’t need any outlets on the small section of exterior wall if we keep the current outlet locations in there.

What will be the fourth and fifth outlets
Feed and first 2 outlets

We made a trip to the dump to finally get rid of the last of the wood from the porch project that’s been laying around.

I ended the day by getting 3 boston butts brining (to slow cook tomorrow for pigging out at work!).  Then I made up a chocolate pie for tomorrow (just to enjoy).

Hopefully we can run some more wire tomorrow, finish up the tvroom outlets, run the subpanel wire and maybe wire the door bell.  Next weekend we can start on the front hallway/staircase which is mostly lighting.  It feels good to be able to work on the house again!