The weekend before last we spent all day Saturday working on filling our dumpster … so bathroom demo time!  We got a good portion of the upstairs bathrooms demo’d and I took up carpet tacks and trim off of 2 of the bedrooms upstairs when there was no room in a bathroom for 2 people 🙂

Door frames removed from closets – this one is ready for a dormer!
Back bedroom – I got most of the trim and all carpet tacks up in here. Not a lot to do in this room hopefully over all.
Master bathroom – toilet and sink/vanity removed
Small bathroom – sink and toilet removed
Looking from master bathroom through wall to smaller bathroom (where sink and toilet were)

We’re going to get the boat out of the water this week and get it ready for winter (clean it out, get it winterized and covered).  Friday we meet with the HVAC guy that did the blower test on the house to get a quote on heating system options and plans.  That’s our first thing we need to get done – heat – before it gets cold!

2 Beams done

Technically we are done jacking up all 3 of the beams we installed (thanks to Ryan’s Dad’s help today – they got it finished up) but 2 of the beams are really finished (bracket installed).  We have to drill holes in the steal brackets for the 3rd beam still.

Bracket with 4×4 in front as extra support
Beams with the extra supports/jacks removed

We still have some jacking up to do – we have another beam to add on the other side and the front needs to be jacked up to remove the rotted sill plate in one section and replace it.

Tuesday we are having someone come out to do some tests and design out our heating system (planning on doing a geothermal system).  Once that work is done we can complete the planned demo and start working on the construction projects like dormers!