Bathroom Progress

2 weekends of updates – I missed last weekend and we had started tiling!  So here’s a recap of progress from the past 2 weekends.

The weekend of the 15th –

Friday and Saturday Ryan got the Kerdi system installed in the shower after sanding the bathroom.  Once sanded I was able to see what needed touch ups in the spackle department and I worked around his tiling project (mostly last week).  Sunday the tile started going in!  We went with a grey porcelein tile and a marble mosaic accent tile to break it up.  The same grey will go on the floors too.

Last sunday’s progress

I got more spackling done (Ryan and I spackled late Saturday night), some electrical (got the outlets in Alex’s room figured out so now we have 3 working outlets and I just have to wire up the rest of the circuit.  The boat also went in the water officially that Saturday so we have been enjoying some breaks out on the Lake!

This past weekend…

We stayed late Friday night again after putting the kids to bed at the house.  We spent the night spackling some more – I finished up the bathroom touch ups and worked on Bella’s room while Ryan got one side of most of the corners in Alex’s room done.

We’ve actually gotten more done than this but this is a more recent picture of Alex’s room

Saturday Ryan finished tiling the shower!

The wet wall finished
The other 2 walls

The shower looks awesome!  We’re waiting to grout until some painting is done (paint comes off tile easily but not grout) 🙂

Sunday I sanded the bathroom walls/ceiling for the final time and cleaned up.  Then I got primer on the whole bathroom – it dries in 1 hour to recoat so then I got the first coat on the ceiling!  Monday night we returned and I got the final coat on the ceiling so that’s officially done.  We’re going over tonight so I can put the first coat on the walls!

First coat on the ceiling

Paint colors for future reference:

Behr Ultra paint used Flat Ceiling for ceilings and Eggshell for walls.  Colors ‘Swiss Coffee’ for ceilings and ‘Beach Foam’ for bathroom walls.

Once the wall paint is done we’ll tile the bathroom floor.  We can’t grout the floor until we get the doors (a few more weeks on those) but we can grout the shower.  We’ll also work on trim – we’re going to do bead board in the bathrooms so the bottom half of the walls will be white (Linen White Satin Impervo from Benjamin Moore for all trim just like our old house).

We’ll get another late spackle night in this week probably (one of us not both) hopefully as I’d like to get Bella’s room closer.  I bought fabrics for making curtains and matching pillows for the girls rooms as well as the shower curtain and window curtain for the bathroom.  So now I have sewing projects too!

 

Spackle Spackle

The taping and spackling continue.  The bathroom is almost done, some of the corners need a side done or touchups but we can easily finish that up this week.  Bella’s room I think the taping is done now (maybe one small seam in the built-in area left) and spackling continues in there.  Alex’s room we’ve started taping, making good progress there in our 1 hour increments of work time with the kids 🙂

Latest bathroom progress
Latest progress in Bella’s room

2 walls in Bella’s room we left as the existing walls (plus part of the ceiling) -i’ll have to get a progress pic of the other direction so you can see the patch work and taping there too.  We’ll see how well they blend together but  the patch is coming out decent for a first coat.

Alex’s room latest progress
Alex’s room the first night we taped it

Since last night worked well putting Bella to bed at the new house and working upstairs while she slept we tried it again this friday with Alex and Bella.  It worked great.  We quit around 10:30 and brought the girls home and Alex loved it.  She wanted to do it again Saturday night but we were so exhausted from running errands all day with both kids we weren’t up to another late night spackling.

Speaking of errands – we got a start on ordering the doors (interior) upstairs – we haven’t finished the order but we gave him the measurements and we’re waiting on a final quote with timeline.  We also bought the tile for the small bathroom now that it’s getting close to tile time!

Alex learned how to spackle Sunday too…

Start them young!

And both girls helped out in the yard on Saturday:

Spreading some new seed

In other news the lake is completely up/filled!  This rainy week we had filled it right up.  Ryan got his new stereo installed in the boat and just has to install the speakers then we’ll put the boat in the water!!!