Bathroom progress

Bathroom progress and Bella’s room progress has continued.  The doors arrived so we got the bathroom door hung so Ryan could finish tiling the floor, then grout and finally seal all the grout!   I also finished the electrical in there (minus the actual vanity light since we haven’t purchased one yet).  The bathroom is ready for trim and trim paint and then toilet and vanity installation.  1 room with an end in sight!  We bought the wood for the trim this past weekend as well – we’re doing a bead board wainscotting in here and craftsman style trim throughout, a little different than the last house!

Bathroom door hung
Floor tiled

Clearly I need some more recent pictures 🙂  I don’t have one of the floor grouted or the door re-hung after cutting it to fit the tile.  It’s also sanded and priming has started.

Bella’s room – I got the sanding done (it took me 2 nights), did a few small touch ups then sanded those.  Since then Ryan’s cousin has gotten the room primed (no pic of that though) and I’ve installed the box for the smoke detector.

Bella’s room – sanding done

We need to buy paint for Bella’s room, hang her door, put up trim, install the floor and do the painting.  (Not in that order) 🙂  Another room that’s getting closer though!

Last Week Progress

We made some progress last week before going away to Boston for the weekend.  Brad got the shower plumbing finished so we can officially shower and bath at the new house!

I got the spackling in Bella’s room potentially finished!  It’s ready for sanding at least and then maybe touch ups.

Ryan spent an evening starting the floor tile in the bathroom!

The doors arrive tomorrow so next up is getting the bathroom door installed so we can finish the tile floor and start the trim in there!  Sanding Bella’s room and touching that up or priming is also next!

Bathroom work continues

Last week I got the first coat of blue (Behr Ultra : Sea Foam) on the walls.  On Monday Ryan got the shower grouted!  On Tuesday he caulked the shower. On Wednesday during naptime I got the second coat of paint on the walls!

Sea Foam is a nice light blue
Tile view
The other wall

The plumbing for the shower started going in last night!  We are waiting on the doors we ordered to arrive – once the door goes in we can do the trim and tile the floor.  Then paint trim and the bathroom is done!

The bedrooms are behind – they need spackling finished, sanding, primer, paint then doors, trim, floors installed.  Lots to do!