Surprisingly they only missed a half day last week due to rain, although they couldn’t paint with the constant threat of rain. Great progress was made when I came home Friday morning and I’ll just explain through the pictures since I wasn’t here to witness it anyhow 🙂
I don’t think I have a picture of the end of friday progress, they got the window caps on the attic windows, all the way around with copper. They got the casings and sills for the attic windows all made, cut and primed, ready to be installed. The goal is to get above the attic windows done completely, as well as down to the sill of the attic windows. Get that caulked/primed/painted, add the red molding and then lower the staging down to just one level to do between the two sets of windows. With the long weekend coming up, hopefully the weather holds so they can get this done like they want.