Front Porch

Now that the master bedroom floor is done and it’s just painting left the focus switched to the front porch.  We are adding a front porch to protect the door and match the dormers.  The first step was digging some 4′ deep holes for footings and filling those.   Mark and Ryan spent a few days digging and then about an hour to finish them up.  I wish I had gotten a picture of the open holes, it was impressive!

New footings – we’re leaving the stairs hidden under the porch
One for alex
and one for Bella

The inspector kindly came out late friday night to inspect the holes so the footings were done Saturday and on Sunday the framing could be started!

The bottom part is done (we have not yet picked out decking!)

Last night we had materials delivered (finally the rain stopped) and Ryan and Mark started on the roof portion!

They have all the rafters cut I believe and hope to work again tonight on it.

The current push to get the porch done is to get it to the point where the roof can be done.  We are having a metal standing seam roof installed in early May and need this porch done (framing) before hand.  The decking and ‘decoration’ like post details and railings can be done later.  I believe once the rafters and zip are on the roof then it’s doing the soffits and tieing them into the house and then we’re ready for the roofer.

Staycation Master Suite

It’s our annual April vacation where the kids go to daycare and we stay home and work on the house – coincides with our birthdays.  This year the focus was on the master suite (just a few more weeks and we’ll have our own room!).

Monday was Alex’s birthday so we did a family fun day but we worked Sunday (Saturday was alex’s bday party), Tues-Friday.  Sunday, Monday, Tuesday and Wednesday the focus was on finishing the trim in the Master and painting the master bathroom.  Ryan got the built-ins finished and all the trim installed by Wed night night.  I painted Tuesday and Wednesday (2 coats on the trim and 1 coat on the walls).  So the master bathroom just needs one more coat on the walls.

Same blue as the small bathroom

The master bathroom trim is white (Ben Moore Chantilly Lace to be exact) – the rest of the house is Linen White (more off white) but we thought with the tile the bright white looked better.

Left built-in finished!

Technically the built-ins need shelves still but the grooves for putting the brackets in are there so it’s just a matter of making the shelves and installing the brackets.

Closet is trimmed out as well – the light box has to be trimmed out but that’s it.
Doors and chair rail all done – even the little closet is trimmed out

Thursday was flooring day!  First we sanded – that took all afternoon, then after a dinner out I went back and did the first coat of poly

First round of sanding
1st coat done!

These are the same as the other bedroom – cherry – but a bit more variety in color I feel like.  It’s beautiful!  Today is our last actual vacation day, we got the sanding done and Ryan is doing the 2nd coat of poly.  Saturday I’ll come over and do the third and by Sunday night we’ll be back in the house (we are staying at my parents while the poly dries) – the fumes generally bother me but it is pretty contained to the bedroom only and the weather is PERFECT for drying the floors quickly and leaving the windows open over night.

We’ve got 3 weeks before we can put a rug in so we have the time to get the trim and walls all painted.  Going to be a busy few weeks as we can’t wait to get in there!

Some progress (house and stitching)

We have a couple of things working against us on the house progress front right now, some planned some not planned.  First we have busy Saturdays entirely for 4 weekends in a row.  Second Ryan got sick, his work got busy then Bella got sick this past weekend and his work is still busy.  Travel and illness and work.

2 weekends ago Ryan managed even though he was sick to get a start on the built-ins in the master – just got the base platforms in.  The built-ins will be just open bookshelves.  We originally were going to do cabinets however the room is a bit tight when you count 2 night stands and a king size bed, the cabinet doors wouldn’t open so we’re going with just open shelves (same amount of storage space).

The base for the left one
And the right

They have to be pretty high off the ground so the trim will look correct going across the front (baseboard).  I’m excited for the extra storage for sure.

In stitching news I’ve had a lot of time in the evenings to stitch (sure I could be painting or something but it’s more fun to stitch) 🙂  I pulled this piece out that I started years ago – it’s called Autumn in my Garden by Mirabilia (there’s one for each season) and I’m stitching it on 40ct fabric over 2 to make it a bit smaller (these pieces are quite large).  I finished up the lady’s skirt and started the pumpkins.  It’s beaded a little bit and I think it will be a very pretty piece when done.

Autumn in My Garden progress

I was only going to show stitching when it was a finished piece but if I’m working on such a large piece I like to track the progress a bit more.  I have another small piece in progress that I’m doing as my travel piece that I’ll show when that’s done.  Continuing to work through my old previously started pieces.  Soon I’ll have to start something new though at this rate!

Trim weekend

Ryan spent the weekend working on trim in the upstairs hallway and master bedroom.  The door trim and baseboards are well under way now!

Doors still need caps but are looking great

That little closet has a door frame now so we can put on a door some day 🙂
In the closet the baseboards are done
I think I’ll be the one putting trim on inside this closet!

The next few weekends are all booked with activities – but hopefully we’ll get some Sunday time to continue work on the trim – we’ll see!

Weekend Progress : Master Bedroom

More progress on the master bedroom this last weekend!  First up – fun thing – since I finished installing all the outlets in the master bedroom and hallway last week I was able to install the LED strip lighting in the linen closet :

Lighting!

It takes a power supply, switch and this strip of LED lights that are adhesive (tape) that I ran all along the inside trim of the closet (all the way around the top) so we get great light in there!  I had planned for this so the outlet was installed in the closet up high for just this.  There’s an outlet near the floor for roomba too.

More importantly though was Ryan’s progress.  Saturday his Dad and he finished up the floor in the bedroom!!!

Floor finished!

The little spot at the end there is where the built-in bookcase will go (so plywood base) – there is one on each side of the closet.  Speaking of closet, then they got the closet door installed!

LOVE this door!

On Sunday Ryan got the threshold to the master finished and installed the bedroom door!

Door done!
Threshold

The plan for this weekend is to get those built-ins done and a good start on trim.  The windows are done so it’s door trim, baseboards and chair rail like in the girls’ rooms.

I’m hoping by the first weekend of April the trim is done and we are sanding/polying the floors in there!  Then it will be painting and we can move in by the end of April?  I’m trying to be conservative because things always come up.  We have a vacation planned in April but if the weather is nice I think Ryan wants to work on the front porch we are adding so that we can get the new roof installed in May.  SO many projects to do!

Flooring

This past weekend was a busy one!  Thursday night Ryan finished installing the trim in front of the tub and I got all the trim caulked and holes filled.

Friday Brad sanded and primed all the trim.

A view of the tub trim finished too! Most of that is removable in case we ever need to get under the tub to the pump.
A view of the tub trim finished too! Most of that is removable in case we ever need to get under the tub to the pump.
Where toilet and vanity will go
Where toilet and vanity will go
Door
Door

Friday night Ryan and I finished the master closet ceiling bead board installation and moved tools downstairs.  The ceiling isn’t finished but we wanted to get the bead board finished so it could be moved downstairs.

Ceiling of closet
Ceiling of closet

Saturday after a trim to home depot for supplies and more cleanup, Ryan and his dad started putting down the new floor in the master bedroom!  It’s hard to work in a room where you’re laying the floor, each time they cut and router they have to vacuum etc but we have no other place to do that part of the work!

By the end of Sunday they had the master closet and about 2/3 of the main room floor finished!  We have to clean it all up and move the pile of wood so this weekend Ryan can finish it up.  Once the floor is done it’s on to door installation and trim!

Floor!
Floor!
This side of the room is done
This side of the room is done
This pile of wood has to be moved so it can be finished :)
This pile of wood has to be moved so it can be finished 🙂

While the guys did the floor on Sunday at naptime I got the door knobs installed on the newly painted doors and filled up my new linen closet (Ryan cut the shelves Sat night for me)!  Finally a closet with a door (this may be my first ever finished closet that has a door on it already!).

Not many linens but it's my first closet for bathroom supplies. And finally towels are out of the hallway!
Not many linens but it’s my first closet for bathroom supplies. And finally towels are out of the hallway!

Linen Closet and Trim

Finally a post with house pictures!  This weekend while I was away Ryan surprised me by finishing the trim in the linen closet and having Brad prime/paint it along with the door (and the door to Alex’s room which still needed paint!).  I just have to finish the outlets in there, set up the lights (LED strips that will plug in) and we can install the closet system!

It’s hard to take a picture of a closet – but you can see the baseboard and door painted at least.

Ryan had finished the beadboard in the bathroom by Saturday but spent Monday working on the caps.  Bathroom trim is almost done and then it will be painted!

Next weekend he hopes to start laying the floor in the master bedroom!

Bathroom Catchup

I’ve really fallen behind on blogging!  And it’s too bad since we took a staycation from work off in November to work on the house (tiling) so I should have updated then – it was a long week though.

So this post will just be a catch up of progress since the last one – based on pictures I have 🙂

The master bathroom was our main project if I go in order – we finished spackling and sanding, then installed water proofing for the shower and floors (Kerdi system)

Sanding done
Sanding done
Shower system installed
Shower system installed
Bathroom door installed
Bathroom door installed
Bathroom ceiling painted (don't want to paint after tile - ceiling painting can involve drips!)
Bathroom ceiling painted (don’t want to paint after tile – ceiling painting can involve drips!)
Getting shower tiles ready to go - Schluter Ditra on the floors
Getting shower tiles ready to go – Schluter Ditra on the floors

Tiling the bathroom was a long process – mostly because we were using big tile and that meant that most of the tiles had at least 1 cut.  It basically went – 1 shower wall done 1 day, 2nd shower wall done 2nd day.  Break on the 3rd day (other projects).  Shower floor 4th day.  1/2 floor day 5 and finish day 6 (saturday after our vacation).  The days were short because we had drop off/pickup at daycare and we were cutting outside until saturday so once it was dark we couldn’t see.  We brought the saw inside Saturday and stayed up late to finish.

After day 2 - shower
After day 2 – shower
Shower floor went pretty quick since we dry laid it first (and cut)
Shower floor went pretty quick since we dry laid it first (and cut)
Shower finished
Shower finished
Floor in progress!
Floor in progress!
Floor finished!
Floor finished!

These pictures I took today but they cover the projects since our vacation.

Tile with the spacers removed (not grouted yet)
Tile with the spacers removed (not grouted yet)

So we haven’t grouted yet – 1 month later!  The reason for this is that the tile turned pretty grey after being installed.  (it started white).  We had to wait for the thinset to dry out so the tile would turn white again (white thinset) – the floor is white now, the shower is still a light greyish tinge but I think we’re going to call it good now.  I love it – it bothers ryan more (the color not being bright white) – but 12x24s take a long time to dry.  So now we have to clean out grout lines, seal the tile, grout, then seal the grout.  So plenty left to do!

Bathtub view.  The wainscotting is going to go across the front of the tub surround (to tie in with the walls)
Bathtub view. The wainscotting is going to go across the front of the tub surround (to tie in with the walls)

Other projects included more sheetrocking …

Master bedroom is sheetrocked (i think 1 sheet is waiting to get installed) - so just about ready for taping
Master bedroom is sheetrocked (i think 1 sheet is waiting to get installed) – so just about ready for taping
Sheetrocking the playroom downstairs - also there's new plywood on the floor that you can't see due to the rug  :)
Sheetrocking the playroom downstairs – also there’s new plywood on the floor that you can’t see due to the rug 🙂

Obviously we couldn’t wait to start using the playroom! I finally have space in my livingroom – this was a must in order to put our tree up this year!

Organization in progress....
Organization in progress….

And then we did the tree!

It's starting to feel like Christmas around here
It’s starting to feel like Christmas around here

This past weekend we started another new project – Garage organization.  We have some new cherry wood coming that we need to store in our garage – but our garage was full!

Step 1 - empty the garage out
Step 1 – empty the garage out
Step 2 - take out the old shelf that was very inefficient
Step 2 – take out the old shelf that was very inefficient
Ryan built new shelves!
Ryan built new shelves!

We can fit more on narrower shelves than we could on that one big/deep one!

And one shelf for strollers... clearly I need to get rid of some strollers
And one shelf for strollers… clearly I need to get rid of some strollers

We finally did some yard cleanup in preparation for snow so this time we were prepared for the snow that came!

The main thing not really shown was the new plywood on the playroom and office floors – nice and sturdy!  The master bedroom will get new plywood next and we’ll start taping/spackling soon.  We’re having flooring for the master made now too (more cherry).

That’s a long post, i’m sure more has been done i’ve missed but right now we are in holiday mode – getting ready for our first christmas here!  The girls are excited – cookie baking this weekend and next week!

Hopefully the pictures all load, I’ve heard they don’t always load – I’m going to try to figure out a new way to show photos if these don’t work well but initial research was not promising.

Spackling and Jacking

I think I’m 2 weeks behind – so let me catch up.  The weekend before last Ryan and his dad sheetrocked the master bedroom (yay!) – i think we have 1 piece left that is waiting on me re-wiring the switch because they cut out the sheetrock that had the switch installed (it had an old work box, needs to be changed to a new work box).

In the meantime I was spackling the bathroom most evenings and finished that last Thursday – plus our tile arrived for the bathroom on Thursday too.  So we were thinking – ready for tile prep this weekend but alas Ryan was concerned about the engineering loads to hold the marble tile without it at some point cracking or popping.  He did some calculations and realized we had a few issues – a) our floor joists weren’t even 2x10s – they are like 8 1/2″ wide not 9 1/2.  Then the subfloor plywood is not structural flooring plywood.  Finally the hardi backer we had down which is not structural is also not recommended for Kerdi because they don’t bond well.  Plus there’s major sag in the floor towards the middle – and leveling would just add more weight.  The hardi backer we put down and it was glued so taking it up was no easy thing.

The plan :

  • Take up all the flooring (hardi and plywood) in the bathroom.
  • Jack up the floor from underneath to reduce a bit of the sag
  • Add 2x6s on the flat to the bottom of each joist – making a T beam essentially – they are glued and screwed – we lose 1.5″ of ceiling height downstairs in that room but gain a LOT of strength to the floor
  • Laminate each side of the floor joists with plywood (we do this a lot to add strength – works great)
  • Put down 3/4 structural plywood then a layer of 1/2 that we will then use the Kerdi system on – including the underlayment on the floor

This was quite a project and due to the rough in plumbing being done – we had to pull that out and the water lines will have to be re-run.  Luckily the drain lines were fine – except for taking out the toilet flange – they were mostly waiting to be installed anyhow.  So a little re-plumbing has to be done – but we have a much more structurally sound bathroom floor and our tiles should not crack.

So far we got steps 1-4 done above – plywood isn’t down yet because we have to take down the jacks (so waiting for glue to fully cure) – then they’ll shim the plywood as they install it to get it more level.  I assume this will happen a bit next weekend.

In good news the sheetrock held up surprisingly well and we hadn’t sanded yet at least!  So there’s a crack over the door – which is very expected since that’s center of the room – which will be repaired once the new floor is in.  Then we just have to patch that one crack,  sand/prime/paint the rest.  Then we can move on to tiling!

We also got the boat out of the water for the season and cleaned off really well – I think the weather is warm and sunny tomorrow so once the rug dries we’ll finish winterizing it and cover the boat then move it to store it over by the driveway (it’s by the hose right now) 🙂

Finally some pictures of what our office ceiling looks like now – and you can see through the floor joists to the bathroom – nothing like going backward in a renovation to move forward in a  better direction!

2x6s along the bottom of each joist and it's still jacked up
2x6s along the bottom of each joist and it’s still jacked up
You can see the bathroom upstairs - spackling done - and the plywood laminated on the sides
You can see the bathroom upstairs – spackling done – and the plywood laminated on the sides

We will continue this across the rest of the office – to support our bedroom floor which we’re not actually worried about but for consistency.  We are going to pull up the 1/2 inch particle board in the master bedroom and replace with 1/2 or 3/4 plywood as a better subfloor for our hardwood.

We also purchased another 750 board feet of Cherry lumber – milled 40 years ago – going to have it turned into flooring for our bedroom and the playroom!  That should be getting delivered this weekend and we’ll take it next week to the mill for planing.  We need to get more still – for the rest of the downstairs but when you get a deal on good Cherry and we’re going with Cherry throughout – we had to jump at it!

 

Master Bathroom Sheetrocked

We’ve been working on some projects lately so I’ll just try to recap some of what we’ve done.

Linen closet :

  • Done : The old shelving was removed, a new door installed
  • Left to do : Spackle, paint, new trim, new shelves

Playroom:

  • Jacked up the ceiling and put in new beams and blocking to support the floor of the dormer
  • Framed out and cut out a door between the playroom and the office (This brings in a LOT of light into the playroom!)

Master Bathroom

This weekend we got the bathroom prep work finished (just a few small things we had left to do) and then got the bathroom sheetrocked!  We’ve started taping/spackling and picked out the tile (we just have to order the tile).  We’re going to go with marble tile in the master!

Bathroom sheetrocked!
Bathroom sheetrocked!
Got a light in there too so we can work at night finally
Got a light in there too so we can work at night finally

Our focus is on getting the bathroom moved along and then we’ll sheetrock the master bedroom!